New Construction Schedule of Values
This cost breakdown spreadsheet is filled out by the general contractor or CM@Risk and used as part of the budgeting/GMP proposal/negotiation process.
This cost breakdown spreadsheet is filled out by the general contractor or CM@Risk and used as part of the budgeting/GMP proposal/negotiation process.
Instructions for the Cost Estimate Cover Sheet, used to summarize the cost estimate for a construction project.
Form SFB NC 522-06 is used to calculate the additional costs associated with new school construction projects including the A/E fee, pre-construction services, FF&E, Computers, etc.
These forms contain the Energy Efficiency & Sustainability Checklist and Worksheets. The Architect/Engineer are to fill out these forms for all new construction projects.
"Projects shall comply with current Ashrae 90.1/ Ashrae 62/IECC"
"Waterless urinals shall be considered in all new projects"
"The equipments/products shall be certified as 'energy star' or as recommended by federal energy management program unless shown not to be cost-effective on a life cycle cost basis"
Use this document to certify to the SFB that a particular architect will be performing design services for your district for a given project.
Owner, Architect, and CM @Risk Design Team certify all aspects of project will comply with building adequacy SFB Rules Document.
Sample resolution for districts to provide if they are contributing district funds to a new construction project
Please submit this form to request a exception from the minimum guidelines.
As required by ARS§15-2041(K)the following affidavits must be signed by the Project Manager and the District Governing Board, respectively, prior to design of a new school project.