Architectural Fee Guidelines

Policy
These guidelines are to be used to determine the Lump Sum Architectural & Engineering (A&E) fees for "Basic Services" for all School Facilities Division (SFD) projects, including both New Construction and Deficiency Correction projects.

Arizona Revised Statutes Governing the SFOB

SFB Rules
Rules

The statutes that govern the School Facilities Oversight Board are in Title 41-STATE GOVERNMENT, Chapter 56-SCHOOL CAPITAL FINANCE. These begin at A.R.S. §41-5701 through A.R.S. §41-5832.

ARRA 2009 Fact Sheet

Standard

The US Department of Education has published this document to provide states and LEAs with basic information regarding how and when Title I, Part A recovery funds will be awarded. In the coming weeks, the Department will provide more guidance regarding these funds, including how they should be used, the sub mission of waiver requests, and the reporting requirements. It also will provide information about Title I School Improvement grants, for which a $3 billion appropriation will be made available beginning Fall 2009. Additional information and documents will be posted on the U.S. Department

ARRA Solar Energy Grant Closeout Form

ARRA Solar Projects
School Facilities Board

Closeout Form SFB NRG 252-10 for ARRA Solar Energy Grant Projects.  This form may be filled out online, then print, sign and submit to the SFB.  If you have any questions, please contact Kerry Campbell at [email protected].

ARRA Solar Energy Grant Project Request for Funds

ARRA Solar Projects

Request for Funds Form SFB ARRA 100-10 for ARRA Solar Energy Grant Projects. This form may be filled out online, then print, sign and submit to the SFB with supporting documentation. If you have any questions, please contact Kerry Campbell at [email protected].

Board Packet Schedule for 2021

School Facilities Board

The following schedule has been established for school districts to submit their project paperwork/applications to their SFB Liaison based upon the dates of the upcoming Board meetings. If a school district submits the project paperwork/application by the submittal deadline, the SFB Liaison will review the submission and determine if it is complete and may be included on the agenda for the next meeting. However, if any additional information is needed, the project may need to be put on a future agenda.  If a school district misses a deadline, the project may be considered for a future meeting

Building Renewal Grant Change Order Form

Other
A school district may request an amendment to the grant if a vendor or contractor submitted a change request to the district for a change of completion date, a change of cost of the Phase Grant, or both.

Building Renewal Grant: Assessment Phase Grant

Procedure

This Phase Grant is specifically intended for securing funds to complete a professional Assessment in order for a school district to determine if an actual BRG deficiency exists. 

Note: This Phase Grant does not include funding for costs associated with Design, Procurement Services, Construction Lite or Construction services; districts should apply separately for these Phase Grants if funds are needed or consult with their SFD Liaison for additional technical guidance. 

 

When To Apply:

When a building system is showing signs of needed repairs or replacement; the professional

Building Renewal Grant: Construction Phase Grant

Procedure
The School District will be prompted to apply for this Phase Grant after an assessment has been completed, a scope of work has been developed, a design has been prepared, the design has been reviewed by SFD staff, procurement has been completed, and now funding for construction is needed.

Building Renewal Grant: Design Phase Grant

Procedure
The School District will be prompted to apply for this Phase Grant after an assessment has been completed, a scope of work has been developed, and professional services are now needed.