CM@Risk Certification

Pre-Construction

Owner, Architect, and CM @Risk Design Team certify all aspects of project will comply with building adequacy SFB Rules Document.

Cost Estimate Cover Sheet

Pre-Construction

Form SFB NC 522-06 is used to calculate the additional costs associated with new school construction projects including the A/E fee, pre-construction services, FF&E, Computers, etc. 

Cost Reduction Items

Standard
The School Facilities Division (SFD) does not fund certain construction items if the construction cost exceeds the approved SFD budget.

Davis-Bacon Document Submission Overview

School Facilities Board

Click the link above for instructions on completing the Davis-Bacon Act Requirements for ARRA funded Energy Efficiency and Solar Energy Grant Projects.  Click the appropriate link below for document samples which contain detailed instructions on completing the Davis-Bacon Act required forms.

Document Title: 

Davis-Bacon Document Submission Overview

Sample Guide for Prime Contractors

Sample Guide for Second Tier Subcontractors

Sample Guide for Third Tier Subcontractors

Deficiencies Correction

School Facilities Board

While this phase of the program has since been completed, the Students FIRST law established a deficiencies correction fund for the purpose of correcting deficiencies in existing school facilities. The School Facilities Board was charged with adopting rules establishing minimum school facility guidelines, assessing school buildings against these guidelines, and providing monies to bring the buildings up to the guidelines. By law, existing deficiencies were to be completed by June 30, 2004.

Demographic Report FY2024

Standard

Demographic assumptions and a proposed construction schedule for individual projects approved in the current fiscal year and expected project approvals for the
upcoming fiscal year to the Joint Committee on Capital Review.