Building Renewal Grant: Procurement Phase Grant
Buy American Categorical Waivers
On February 11, 2010, the U.S. Department of Energy issued a Memorandum of Decision granting nationwide categorical waivers under section 1605 of the Recovery Act (the Buy American Provisions) for fluorescent electronic lighting ballasts, LED traffic lights and signals, and CFL's (with a few exceptions described in the waiver). These categorical waivers go into effect immediately. Click the link above to read the Memorandum of Decision for details.
Campus Layouts
Catalina Foothills Unified
Checklist for Recoat of SPF Cementitious roof system final
Chino Valley Unified
Clay Tile FINAL
Clifton Unified
CM@Risk Certification
Owner, Architect, and CM @Risk Design Team certify all aspects of project will comply with building adequacy SFB Rules Document.
Coal Estimate Cover Sheet
Concrete Tile FINAL
Continental Elementary
Cool Roof Coating FINAL
Cost Estimate Cover Sheet
Form SFB NC 522-06 is used to calculate the additional costs associated with new school construction projects including the A/E fee, pre-construction services, FF&E, Computers, etc.
Cost Estimate Cover Sheet Instructions
Instructions for the Cost Estimate Cover Sheet, used to summarize the cost estimate for a construction project.
Cost Reduction Items
Cottonwood-Oak Creek Elementary
Database Management and Programming
Contact Name: John Penczar
Job Title: Agency CIO
Phone Number: 602-364-0283
Email Address: [email protected]
Davis-Bacon Document Submission Overview
Click the link above for instructions on completing the Davis-Bacon Act Requirements for ARRA funded Energy Efficiency and Solar Energy Grant Projects. Click the appropriate link below for document samples which contain detailed instructions on completing the Davis-Bacon Act required forms.
Document Title:
Davis-Bacon Document Submission Overview
Sample Guide for Prime Contractors