Building Renewal Grant: Procurement Phase Grant

Procedure
The School District will be prompted to apply for this Phase Grant after an assessment has been completed, a scope of work has been developed, a design has been prepared, the design has been reviewed by SFD staff, and procurement services are now needed.

Buy American Categorical Waivers

ARRA Solar Projects

On February 11, 2010, the U.S. Department of Energy issued a Memorandum of Decision granting nationwide categorical waivers under section 1605 of the Recovery Act (the Buy American Provisions) for fluorescent electronic lighting ballasts, LED traffic lights and signals, and CFL's (with a few exceptions described in the waiver). These categorical waivers go into effect immediately. Click the link above to read the Memorandum of Decision for details.

CM@Risk Certification

Pre-Construction

Owner, Architect, and CM @Risk Design Team certify all aspects of project will comply with building adequacy SFB Rules Document.

Cost Estimate Cover Sheet

Pre-Construction

Form SFB NC 522-06 is used to calculate the additional costs associated with new school construction projects including the A/E fee, pre-construction services, FF&E, Computers, etc. 

Cost Reduction Items

Standard
The School Facilities Division (SFD) does not fund certain construction items if the construction cost exceeds the approved SFD budget.

Davis-Bacon Document Submission Overview

School Facilities Board

Click the link above for instructions on completing the Davis-Bacon Act Requirements for ARRA funded Energy Efficiency and Solar Energy Grant Projects.  Click the appropriate link below for document samples which contain detailed instructions on completing the Davis-Bacon Act required forms.

Document Title: 

Davis-Bacon Document Submission Overview

Sample Guide for Prime Contractors

Sample Guide for Second Tier Subcontractors

Sample Guide for Third Tier Subcontractors