Clifton Unified
CM@Risk Certification
Owner, Architect, and CM @Risk Design Team certify all aspects of project will comply with building adequacy SFB Rules Document.
Coal Estimate Cover Sheet
Concrete Tile FINAL
Continental Elementary
Cool Roof Coating FINAL
Cost Estimate Cover Sheet
Form SFB NC 522-06 is used to calculate the additional costs associated with new school construction projects including the A/E fee, pre-construction services, FF&E, Computers, etc.
Cost Estimate Cover Sheet Instructions
Instructions for the Cost Estimate Cover Sheet, used to summarize the cost estimate for a construction project.
Cost Reduction Items
Cottonwood-Oak Creek Elementary
Database Management and Programming
Contact Name: John Penczar
Job Title: Agency CIO
Phone Number: 602-364-0283
Email Address: [email protected]
Davis-Bacon Document Submission Overview
Click the link above for instructions on completing the Davis-Bacon Act Requirements for ARRA funded Energy Efficiency and Solar Energy Grant Projects. Click the appropriate link below for document samples which contain detailed instructions on completing the Davis-Bacon Act required forms.
Document Title:
Davis-Bacon Document Submission Overview
Sample Guide for Prime Contractors
Deficiencies Correction
While this phase of the program has since been completed, the Students FIRST law established a deficiencies correction fund for the purpose of correcting deficiencies in existing school facilities. The School Facilities Board was charged with adopting rules establishing minimum school facility guidelines, assessing school buildings against these guidelines, and providing monies to bring the buildings up to the guidelines. By law, existing deficiencies were to be completed by June 30, 2004.
Demographic Report
Demographic Report FY2024
Demographic assumptions and a proposed construction schedule for individual projects approved in the current fiscal year and expected project approvals for the
upcoming fiscal year to the Joint Committee on Capital Review.